Talk to the leading renewable and solar panel installers in Northern Ireland, with an
established track record and knowledge, that only years of experience can bring.
Featuring an extensive 211.68 kW solar power system comprised of 378 high-efficiency 560W panels. In its first year alone, this system is projected to generate 182,378 kWh of clean energy, resulting in a substantial carbon offset of 60,185 kg. Over 25 years, even accounting for a yearly efficiency loss of 0.8%, the array is expected to produce an impressive 4,147,445 kWh of energy, translating to a total carbon offset of 1,368,657 kg, assuming grid CO2 levels remain constant. This project in collaboration with the NHS will benefit both staff and patients.
August 6, 2024
Solar
Talk to the leading renewable and solar panel installers in Northern Ireland, with an
established track record and knowledge, that only years of experience can bring.
Unit 2, Anaghloo Industrial Estate, Limavady, BT49 0HE
Craoibhin Community Enterprise Centre, Letterkenny, Co. Donegal
2nd Floor, 5 High Street, Westbury on Trym, Bristol, BS9 3BY
© 2024 TRE Energy Ltd. All Rights Reserved
Made with by VINDICTA®